collecting-the-evidence 2: stakeholder-input-public-consultation
Template Consultation Document that can be adapted for a particular country is included in the Tools and Resources.
For novel or complimentary tobacco control polices in particular, allowing all potential stakeholders, including industry, the opportunity to make submissions or comments means the policy is developed having taken all issues and views into account. The advantages of a consultation are that:
Most countries (but not all) that have adopted plain packaging laws did so after a process that allowed stakeholder input.
The process for stake holder input should be guided by the normal administrative procedures in each country. One option is to have full public consultation; alternatively the process may, for instance, form part of parliamentary committee procedures allowing key stakeholders to make written submissions or by way of public hearings, which can be a shorter procedure. In Ireland, the Public Health (Standardised Packaging of Tobacco) Bill was referred to the parliamentary Joint Committee on Health, which ran public hearings for key stakeholders.
It may be unusual for the Health Ministry in some countries to run public consultations in respect of public health measures. Governments do not need to undertake a process for plain packaging that is outside of its normal constitutional requirements. It is also important to bear in mind that a poorly run public consultation, which does not allow effective responses or is a mere sham because the government has already made up its mind, can lead to greater legal problems than not running one at all.
“When seeking comments or submissions from tobacco companies, governments need to be careful to comply with Article 5.3 of the WHO FCTC which stipulates that Parties shall act to protect tobacco-control policies from commercial and other vested interests of the tobacco industry. Given that plain packaging involves technical regulations that impact on the way in which a product is manufactured, it can be important that those parts of industry that are impacted be allowed to have their input considered. They key to interaction with the industry is to be clear about exactly what issues comments are sought on and to ensure there is complete transparency in respect of any meeting or discussion.
Tobacco companies can provide written submissions, which should then made publicly available. Meetings can take place but should be limited to where specific information is needed in relation to potential costs to industry or to technical drafting of the legislation which may impact on the manufacturing process in an unnecessary way. Where meetings do take place, full records should be made publicly available about the arrangements, who was present at the meeting and minutes of what was discussed.
If a public consultation is run by the Health Ministry, sufficient time needs to be factored into the process to allow stakeholders to respond and also to allow the Health Ministry officials time to properly consider the submissions and any amendments to the legislation that flow from those submissions.
Consultations on tobacco product plain packaging have generated huge volumes of responses because of campaigns funded by the tobacco industry on one side, and tobacco control advocacy groups on the other. This led to 650,000 responses to the first UK consultation – more than any previous public consultation. If resources are not available to consider huge numbers of responses, an alternative method of allowing key stakeholders to provide their submissions should be used that invites the key interested bodies or organizations to make submissions. A consultation is not a vote but a means of ensuring all relevant issues and views are considered.
A decision must be taken as to the best stage to have stakeholder input, and this will depend on local circumstances. One option is to consult or take submissions on the principle of whether or not to proceed with the plain packaging, but it may be preferable to consult not on whether or not to proceed but on the detail of proposal.
A consultation document also needs to be meaningful and provide stakeholders with sufficient information to respond. It is recommended that it includes the following: